Monday, November 30, 2009

the gutters & fascia...

Day 46: The gutters and fascia have been put up, and are 99% complete! Starting to take shape now... only another week until bricking is scheduled to start!!!


Friday, November 27, 2009

the plumbing...

Day 41: Massive storms and flooding across Melbourne did not stop the plumbers from putting in the pipe work!

Wednesday, November 25, 2009

the timber windows...

Day 40: The timber framed windows are in (however they are not in the correct positions - bit of obvious stupidity - maybe related to the empty beer bottles we cleaned up on site?). The 3 awning windows are meant to go TOGETHER, and the non-opening window is meant to go on the right, I would have thought it would be obvious???

The posts for the portico (to be bricked) are in, although not yet bolted into the concrete.

Both of the sliding doors to the alfresco have massive splits in the timber. Not happy, these will be replaced. The white stars (that make you not walk into the glass) are positioned quite low... not sure if the panels have been put in upsidedown? Will stop our dogs from walking into the glass doors... but wont stop humans!!!

Tuesday, November 24, 2009

the roof trusses cont...

Day 39: Roof trusses almost completed, portico started, temp fencing appeared...

Monday, November 23, 2009

the roof trusses...

Day 38 today, the roof trusses were delivered on site and erected!!!

Tuesday, November 17, 2009

the windows...

are mostly in! All except one for the pool room, and the timber windows for the facade. Pretty peed off to see 4 kids hanging around and tresspassing in our neighbours house. Found a smashed window on our site, and after the kids took off, we inspected our neighbours house and found smashed windows in there. Kids make me so damn mad!!!

Monday, November 16, 2009

the frame continues... still

Day 31: The frame looks almost complete... except for garage and roof trusses.

View from the front...

Master bedroom...

View from pool room looking into dining/kitchen, with family room in the background...

Pool room...

Standing in the the alfresco looking into dining/kitchen...

Saturday, November 14, 2009

the frame continues...

...on a Saturday!
It's day 29 since site scrape and our house has taken 3D form. Woohoo!!!

Thursday, November 12, 2009

the frame commences...

Day 27: The frame has started!!!

From the front...

From the back...

Monday, November 9, 2009

the slab...

...was poured today!!!
The front view - dead centre...
View from front left...
Box of goodies left as a slab warming present?...
View from the back of the block...

Thirsty concreters?...

Sunday, November 8, 2009

the foundation - boxed up...

Day 22, guys worked on a stinking hot Saturday boxing up the foundations ready for the slab pour.
View from the front
View from the back


Friday, November 6, 2009

the base foundation...

Headed out to the block tonight to see the foundation work. It's the most exciting part so far! ...except... the bloody damage done by the concreters to our plumbing.

View from the road...

View from the rear of the block...

Downpipe No. 1 near meter box damaged...

Downpipe No. 2 off laundry bent over...

Downpipe No. 3 off bed3 now non existent!! the mungrels just covered it up completely. Aaron uncovered it so we could show the builder...